by aquaterr1 | Sep 9, 2021
Construction of two berms using onsite soil/clay to capture & create seasonal inundation with overflow pipes for wetland creation Excavation of 16 ponds for amphibian habitat with LWD Minimum disturbance to established vegetation, snag development, &...
by aquaterr1 | Sep 9, 2021
Project Description Public trail located in Anacortes, WA designed to include the following: Coordination with the City of Anacortes & WDFW Constructed on top of an existing railroad bed Approximately 2,100 feet east from Edwards Way along the shoreline Planter...
by aquaterr1 | Sep 9, 2021
Mitigation Site within the Landscape Headwater wetland construction with direct connection to Slater Slough & its downstream tributaries & waterbodies Slater Slough – Smugglers Slough – Lummi River – Lummi Bay – Salish Sea Important ecological functions &...
by aquaterr1 | Sep 9, 2021
Ecology WQC & Corps NWP Impacts 57,694 square feet (1.32 acres) Category IV wetland fill 35,089 square feet (0.81 acre) Category IV wetland “paper fill” 20,024 square feet (0.46 acre) upland buffer impact Mitigation 75,394 square feet (1.73 acres) wetland creation...
by aquaterr1 | Sep 9, 2021
Study designed & conducted to identify vegetation habitat, rare plants, & wildlife in accordance with a previously approved study plan for the proposed Black Canyon Hydroelectric Project (FERC #14110). Project to include an intake, powerhouse, underground...